Project Summary:
Client: China Wu Yi Ltd
Date: April 2019 – 2022
Role: Nominated Sub-Contractor
Project Description
Earthworks and Drainage works which involved swamp treatment works with Box and pipe culvert lines’ excavations, steel works/bar-bending schedules, formwork and concrete works of the drainage end structures at Buhimba- Buramagi- Kakumiro Road (48 km)