Project Summary:
Design and Build of Ruzairwe, Nsongi, Mpanga-6 and Mpondwe bridges with Approach roads upgraded to Class B Bitumen standard
Client: Uganda National Roads Authority
Role: Main Contractor
Project Description:
Design and build of Mpondwe bridge on Kampala-Mubende-Fort Portal-Uganda/DRC border road, Nsongi bridge on Kasisi-Rutete-Kabati-Rwenkerizi- Kyanga road, Ruzairwe bridge on Kibaale-Kyebando-Pacwa road and Mpanga-6 Bridge on Kamwenge-Kabambiro road